Henan Staurk Machinery CO.,LTD info@staurkmac.com 86--13838395283
Henan Staurk Machinery CO.,LTD company profile
Products
Home > Products > Gold Ore Processing Equipment > Full Set Mineral Processing Machine 20TPD-3000TPD Mobile Gold Wash Plant

Full Set Mineral Processing Machine 20TPD-3000TPD Mobile Gold Wash Plant

Product Details

Place of Origin: China

Brand Name: Staurk

Certification: CE ISO

Model Number: XJK SF JJF Series

Payment & Shipping Terms

Minimum Order Quantity: 1

Price: 2000USD-80000USD

Packaging Details: Container or Bulk Cargo Ship or Flat Rack

Delivery Time: 30 days

Payment Terms: T/T

Supply Ability: 50 sets

Get Best Price
Chat Now
Product Details
Highlight:

mineral processing machine 20tpd

,

3000tpd mobile gold wash plant

,

20tpd mobile gold wash plant

Processing Capacity:
20TPD-3000TPD
Input Size:
200mesh
Origin:
China Manufacturer
After Sale Service:
Our Engineers Will Do Installtion And Commissioning And Training On Site If Need
OEM:
Acceptable (buyer Provide Drawings)
Motor Brand:
China Famous Brand
Years Experience:
More Than 20 Years
Service Before Sale:
General Drawing Avaliable
Quality Inspection:
Acceptable By Third Party Like SGS,TUV,etc
Processing Capacity:
20TPD-3000TPD
Input Size:
200mesh
Origin:
China Manufacturer
After Sale Service:
Our Engineers Will Do Installtion And Commissioning And Training On Site If Need
OEM:
Acceptable (buyer Provide Drawings)
Motor Brand:
China Famous Brand
Years Experience:
More Than 20 Years
Service Before Sale:
General Drawing Avaliable
Quality Inspection:
Acceptable By Third Party Like SGS,TUV,etc
Product Description

Full set mineral processing machine for mobile gold wash plant


1.Product Introduction Ore Beneficiation Equipment

The Mobile Gold Washing and Recovery Plant is a modular mineral processing system that integrates crushing, screening, washing, and concentration. It is specifically designed for placer gold mining, riverbed panning, and tailings reclamation. Featuring a detachable modular structure, the plant supports wheeled, crawler, or skid-mounted chassis, allowing it to adapt to complex terrains such as deserts, riverbanks, and mountainous regions for rapid deployment and easy relocation. Core components include a vibrating feeder, a high-pressure wash trommel screen, a classifying screen, gravity separation sluices, and a tailings conveyor system. The plant is driven by diesel generators or electric motors and supports automated control and remote monitoring.


2.Application Ore Beneficiation Equipment

  • Placer Gold Mining: Ideal for high-mobility gold recovery operations in rivers and tidal flats, serving as an efficient alternative to stationary lines while reducing initial capital expenditure (CAPEX).

  • Tailings Re-selection: Secondary recovery of low-grade tailings to maximize resource utilization and mitigate environmental impact.

  • Remote Mining Development: Enabling rapid production and high-efficiency operations in regions with poor infrastructure, such as parts of Africa and Southeast Asia.

  • Environmental Remediation: Integrated with wastewater treatment systems to meet strict environmental standards, suitable for mining operations near urban areas.


3.Working Principle Ore Beneficiation Equipment

  • Feeding & Coarse Screening: Raw material enters a multi-stage screening system via a vibrating feeder. Waste rock larger than 10cm is separated to reduce the processing load on downstream components.

  • High-Pressure Washing & Scrubbing: Material smaller than 10cm enters the trommel screen, where high-pressure water jets perform triple-spraying to strip away clay and sand, ensuring gold particles are fully liberated.

  • Classification & Separation:

    • Fine Materials (<6mm): Transported via slurry pumps to horizontal centrifugal concentrators or pulsating sluices, utilizing centrifugal or gravitational force for gold enrichment.

    • Medium Materials (6–15mm): Directed to fixed sluice boxes for further recovery.

    • Coarse Materials (>15mm): Discharged as final tailings.

  • Tailings Management: Equipped with a water recycling system, achieving a water utilization rate of up to 90% and reducing discharge risks.

4.Advantages Ore Beneficiation Equipment

• High Recovery Rate: Utilizing horizontal centrifugal technology, the recovery rate for crystalline placer gold exceeds 90%, with some units reaching over 95%.
•  Flexible Deployment: The modular design allows for rapid assembly and disassembly, reducing transportation costs by 40% and making it ideal for frequent site changes.
•  Intelligent Control: Equipped with a real-time monitoring system to remotely track operating status and gold content data, minimizing manual intervention.
•  Superior Durability: Core components such as the trommel screen are made of high-manganese steel, offering a service life of over 5 years and reducing maintenance frequency by 60%.
•  Environmental Compliance: Integrated wastewater treatment and dust recovery systems satisfy increasingly stringent environmental regulations.
•  Cost-Effectiveness: Compared to stationary production lines, the investment is reduced by 30%, making it perfect for small-to-medium mines or rapid production during the exploration phase.


5.Technical Specifications

Category Model Effective Volume (m³) Capacity (m³/min) Impeller Diameter (mm) Impeller RPM (r/min) Motor Power (kW) - Agitating Motor Power (kW) - Scraper Single Weight (t)
XJK type Flotation machine XJK-0.35 0.35 0.18-0.4 300 480 1.5 0.75 0.6

XJK-0.62 0.62 0.3-0.9 350 400 3 1.1 0.9

XJK-1.1 1.1 0.6-1.6 500 330 5.5 1.1 1.3

XJK-2.8 2.8 1.5-3.5 600 280 11 1.5 2.5

XJK-5.8 5.8 5-7 750 240 15 1.5 3.6
SF type Flotation machine SF-0.37 0.37 0.2-0.4 300 352-442 1.5 0.55 0.5

SF-0.65 0.65 0.3-1.0 350 336 3 1.1 1

SF-1.2 1.2 0.6-1.6 450 298 5.5 1.1 1.5

SF-2.8 2.8 1.5-3.5 550 268 11 1.5 2.3

SF-4 4 2-4 650 237 15 2.2 2.8

SF-8 8 4-8 760 191 30 2.2 4.3

SF-10 10 5-10 760 191 30 3 4.6

SF-16 16 6-16 850 180 45 3 7.8

SF-20 20 8-20 730 186 55 3 9.8
JJF type Flotation machine JJF-2 2 1-3 370 400 11 1.1 1.9

JJF-4 4 2-4 410 305 15 1.5 2.3

JJF-8 8 4-8 540 233 22 2.2 4.5

JJF-10 10 5-10 540 233 22 2.2 4.9

JJF-16 16 5-16 700 180 37 2.2 8.2

JJF-20 20 5-20 730 180 37 2.2 10.5

6.Our Solutions


Full Set Mineral Processing Machine 20TPD-3000TPD Mobile Gold Wash Plant 0

Full Set Mineral Processing Machine 20TPD-3000TPD Mobile Gold Wash Plant 1